A residential DA in Sydney needs a survey, a site plan, existing and proposed floor plans, elevations, at least one section, shadow diagrams where overshadowing is in play, a landscape plan, notification plans, and the BASIX commitments marked on the drawings.

Miss one and you won't be arguing the design with a planner. You'll be stuck at lodgement re-uploading files. Councils publish documentation checklists and the NSW Planning Portal checks the set before an assessor looks at the scheme. Check your own council's list too, because each one differs a little.

Why do you need a survey first?

Every DA drawing sits on a detail and contour survey by a registered surveyor. It shows boundaries, levels, existing structures, significant trees and the outlines of the neighbouring buildings.

In Sydney that's typically $1,900 to $3,500 plus GST for a residential block, more on steep or heavily treed sites. Council checks your proposed levels against the surveyed levels. A designer working from an old survey or a title diagram is guessing, and the assessor can tell.

Which drawings make up the core set?

  • Site plan, usually at 1:200. Setbacks, site coverage, landscaped area, stormwater direction, driveway. These numbers are assessed against the LEP and DCP, so they have to be exact, not rounded.
  • Floor plans at 1:100, existing and proposed. Demolition shown, rooms named, floor levels tied to the survey.
  • Elevations of every face the work touches. Heights above natural ground, materials, and neighbouring buildings where they matter.
  • Sections, at least one, cut through the tallest or most contested part of the building to prove the height and ceiling claims.

When do you need shadow diagrams?

Whenever your work could overshadow a neighbour. Additions that go up, or come closer to the boundary, usually trigger them.

The standard is shadows at 9am, 12 noon and 3pm on 21 June, the winter solstice, showing existing and proposed side by side. On a terrace street where the neighbour's only living-room window faces your extension, these drawings can decide the application. Councils increasingly ask for elevation shadow studies on the affected windows too, not just shadows on the ground.

What do people forget?

  • Landscape plan. Deep soil, trees kept and removed, new planting. A landscape designer usually prepares it, though on simple alterations the building designer can.
  • Notification plans. A simple A4 version of the proposal, readable without a scale rule, sent to your neighbours. Inner West Council won't notify without them.
  • BASIX on the drawings. BASIX applies to almost all residential work. The certificate's commitments, such as glazing, insulation and rainwater tank, must be written onto the plans. A certificate that contradicts the drawings invites a request for more information.

Who prepares each drawing, and what does it cost?

  • Building designer: the site plan, floor plans, elevations, sections, shadow diagrams and notification plans, and coordinating everyone else. For DA drawings on a Sydney renovation or addition, typically $5,000 to $15,000 depending on scope.
  • Surveyor: the base survey.
  • Landscape designer: the landscape plan on anything beyond simple.
  • BASIX consultant: the certificate on larger jobs, a few hundred dollars.

Heritage, flood or bushfire sites add specialist reports on top. Not sure who to engage first? Read architect, building designer or builder: who do you need first?

Can you build from DA drawings?

No. A DA set is a planning argument, drawn to show the envelope complies. It has no footing details, waterproofing or framing. The engineering comes in the construction certificate drawings after consent.

That's where thin DA schemes come undone. The section that looked fine at 1:100 turns out to need a transfer beam that eats the ceiling height the DA promised. Before you engage a designer, ask to see a construction set from their last job, not just the DA drawings.

The short version

  • Start with a current detail and contour survey.
  • Core set: site plan, floor plans, elevations, at least one section.
  • Shadow diagrams at 9am, 12 noon and 3pm on 21 June if neighbours could be affected.
  • Don't forget the landscape plan, A4 notification plans and BASIX commitments on the drawings.
  • Check your council's own lodgement checklist.
  • DA drawings aren't construction drawings. Ask to see both.

Preparing a DA in Sydney? Send us what you have and we'll tell you what's missing.