Guides

Straight answers to building in Sydney.

The questions people ask us most, answered plainly and kept up to date.

Choosing who builds

3 questions
  • How to choose the right builder in Sydney

    Choosing a builder mostly comes down to trust, but you don't have to trust blind. Here are the public records to check, the rules to know, and the questions to ask before you sign.

    Updated 5 min read

  • Volume builder or custom builder?

    A volume builder suits a flat block, a standard design and a tight budget. A custom builder suits a hard site, your own plans or a specific brief. Most people know which one they are once they look at their block honestly.

    Updated 4 min read

  • Architect, building designer or builder: who do you need first?

    If your project needs approval, you usually need a designer first, either an architect or a building designer, because nobody can price drawings that don't exist. Bring a builder in early to keep the design on budget.

    Updated 4 min read

Cost, time & contracts

5 questions
  • Is it cheaper to build or buy in Sydney?

    In Sydney the land usually decides it. If you have to buy a block first, building is rarely the cheap option. If you already own the land, a knockdown rebuild can change the maths completely.

    Updated 4 min read

  • Knockdown rebuild or renovation: which is better, and what does each cost?

    Rebuild when the structure is tired, you're changing most of the house and the planning controls let you. Renovate when the bones are good, heritage rules protect the house, or you're changing less than you think. Either way, the build quote is only part of the cost.

    Updated 5 min read

  • How much does it cost to build a house in Sydney?

    Rider Levett Bucknall puts a custom-built house in Sydney at $2,500 to $7,600 per square metre of construction, before GST, land, fees and site works. Your site and design decide where you land in that range.

    Updated 5 min read

  • How long does it take to build a house in NSW?

    Construction alone averaged just under three quarters, about nine months, for new houses in NSW in 2025-26 (ABS). Design and approval come before that, and the builder's program decides a lot of what happens after.

    Updated 4 min read

  • Fixed price or cost plus?

    Fixed price gives you a set figure for the known scope, with the builder pricing in the risk. Cost plus gives you the actual costs plus a fee, full transparency but no guaranteed final figure. Neither is fixed for work nobody has defined yet.

    Updated 5 min read

Approvals & planning

2 questions
  • What drawings do you need for a DA in Sydney?

    A residential DA in Sydney needs a survey, site plan, floor plans, elevations, at least one section, shadow diagrams where overshadowing is in play, a landscape plan, notification plans and BASIX commitments shown on the drawings.

    Updated 4 min read

  • Can I build a dual occupancy on my Northern Beaches block?

    Probably, if your block is zoned R2 and big enough. Dual occupancies are permitted with consent in R2 zones across the Northern Beaches. In the former Warringah area the lot must be at least 800 m², unless you're inside a state low and mid-rise housing area near a town centre.

    Updated 4 min read

Selections & finishes

1 question
  • What selections do you need to make when building a home?

    Before building starts you'll choose the consultants, then every fixture and finish room by room: wet areas, kitchen, joinery, flooring, lighting, windows, roofing and landscaping. The earlier they're locked in, the more accurate the price and the smoother the build.

    Updated 5 min read

Hard sites

3 questions

After the build

2 questions
  • What counts as a defect in a new home in NSW?

    NSW Fair Trading publishes a Guide to Standards and Tolerances with measurable limits for new home work: how wide a crack can get, how flat a floor must be, how big a door gap can be. Inside the limits is normal. Outside them is a defect your builder should fix.

    Updated 5 min read

  • How do you look after a new home?

    Let the house dry out slowly for the first 8 to 12 weeks, keep water away from the slab, and work through a simple monthly, yearly and longer-term checklist. Routine upkeep like silicone, gutters and termite inspections is the owner's job, and skipping it can weaken a defect claim.

    Updated 4 min read

Got a question that isn't here? Ask us.Follow by RSS

Varloch Group client testimonial
NSW BuilderLic. 373007C
Building PractitionerBUP0004294
PlumbingLic. 479776C
Public LiabilityFully insured
HBCF$6M cover
Recognition2025 Trades Champion finalist