NSW Fair Trading publishes a Guide to Standards and Tolerances that puts numbers on "acceptable" building work: how wide a crack can get, how flat a floor must be, how big the gap around a door can be. Inside those limits is normal. Outside them is a defect, and your builder should fix it.
Most owners never see it. It's free, and it's worth having before handover, whoever built your home. Download the NSW Guide to Standards and Tolerances 2017 (PDF).
What is the NSW Guide to Standards and Tolerances?
It's the reference builders, owners and inspectors use when they disagree about whether something is a defect. It covers everything from paving and slabs to plaster, tiles, paint, doors, gutters and pools.
It's a guide, not law. Your contract, the Building Code of Australia, Australian Standards and the manufacturer's installation instructions all come first. The guide is used where those documents don't answer the question. It can also be used by later owners, not just the person who signed the building contract.
How are you meant to inspect a finish?
From a normal viewing position. The guide defines that as standing 1.5 m or more from a wall, floor or ceiling (600 mm for appliances and fixtures), in ordinary diffused light. Not a torch held flat against the wall, and not glancing light from a low winter sun.
That one rule settles a lot of arguments. A mark you can only find with your nose on the plaster is not a defect. A paint run you can see from across the room is.
Tolerances are also not scaled down for shorter lengths. If the limit is 4 mm over 2 m, the same 4 mm applies over 500 mm. It doesn't become 1 mm.
Which cracks are normal, and which are defects?
New houses crack as construction moisture dries out of the timber, plaster and concrete. Hairline cracks at cornices and joins in the first months are expected. The guide draws the line here:
- Plaster walls and ceilings: a defect if the crack was there at handover, or grows wider than 1 mm within 24 months and can be seen from a normal viewing position. Cornice joints are judged the same way.
- Where two different materials meet: a defect over 1 mm in the first 12 months, or over 2 mm after that.
- Brick and block walls: cracks under 5 mm (category 2) are watched for 12 months. Category 2 or worse at the end of that period needs repair.
- Concrete slabs: hairline cracks under 0.3 mm are rated negligible. Wide cracks from 2 mm, or an obvious change in level, are a defect.
- Driveways and paving: cracks up to 1.5 mm are within tolerance. Cracking from trees, heavy vehicles or garden watering isn't the builder's fault.
Photograph any crack with a ruler beside it and note the date. That record matters if it grows.
How flat and straight should floors, walls and doors be?
- Floors: no more than 4 mm out of level in any 2 m length, 10 mm across any room, and 20 mm across the whole house, for the first 24 months.
- Walls: no more than 5 mm out of plumb or bowed over a 1.8 m straight edge.
- Internal doors: even gaps of 2 mm to 5 mm around the door, and no more than 20 mm under it once the flooring is down. Doors that bind or jam in the first three months are a defect.
- Tiles: no more than 2 mm step between neighbouring tiles (1.5 mm for polished tiles), and flat to within 4 mm over 2 m.
- Timber floors: a step of up to 0.5 mm between boards is allowed. Floors that consistently squeak when you walk on them in the first 24 months are a defect.
What surprises most new owners?
- Paint has a minimum life. Interior paint and exterior acrylic must last 36 months without lifting, blistering or flaking. Exterior enamel 24 months, semi-transparent stains 12.
- Joinery has a short window. If your contract doesn't say otherwise, defects in benchtops, cabinet doors and drawer fronts must be raised within six months.
- Silicone is your job. The guide says wet-area silicone may need replacing after five years, and that's normal owner maintenance.
- Gutters can hold a little water. They're only defective if they hold more than 10 mm.
- Open shower screens aren't meant to keep the floor dry. Water spreading past an unenclosed screen isn't a defect.
- Stone and timber vary. Natural colour and pattern variation isn't a defect. Chips and cracks caused by the builder are.
- Some damage is on you. A gutter bent by your ladder, or a properly built drain blocked by tree roots, isn't the builder's to fix. Foundation movement caused by later landscaping or blocked drainage isn't either.
How long is a builder responsible for defects in NSW?
Two periods run at once.
- The defects and liability period in your contract. For new homes it's usually 13 weeks, but it varies, so check your contract (NSW Government).
- Statutory warranties under the Home Building Act: 6 years for major defects and 2 years for all other defects, from completion (NSW Government). These apply even if your contract doesn't mention them.
A major defect is one in a major element, such as footings or a load-bearing wall, that makes the building unusable or threatens collapse (Home Building Act 1989, s 18E). Report defects in writing, with dated photos. Once you've moved in, the routine upkeep is yours: see how to look after a new home.
The short version
- NSW Fair Trading's Guide to Standards and Tolerances puts numbers on acceptable work.
- Judge finishes from 1.5 m away in normal light, not with a torch.
- Plaster cracks over 1 mm in the first 24 months are a defect. Hairlines are normal.
- Floors: 4 mm in 2 m, 10 mm per room. Walls: 5 mm over 1.8 m. Door gaps: 2 to 5 mm.
- Paint must last 36 months inside. Joinery defects must be raised within six months.
- Statutory warranties: 6 years for major defects, 2 years for everything else.
Download the NSW Guide to Standards and Tolerances 2017 (PDF), published by NSW Fair Trading under a Creative Commons Attribution 4.0 licence.
Not sure whether something in your new home is a defect? Send us a photo and we'll give you a straight read.